[{"data":1,"prerenderedAt":250},["ShallowReactive",2],{"cities":3,"content-\u002Fnews\u002Fnavy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling":19,"section-agriculture":149,"image-construction-site-crane-farmland-aerial-8f5234":164,"related-\u002Fnews\u002Fnavy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling":202},[4,9,14],{"county":5,"tag":6,"title":7,"to":8},"Kern County","bakersfield","Bakersfield","\u002Fbakersfield\u002F",{"county":10,"tag":11,"title":12,"to":13},"Fresno County","fresno","Fresno","\u002Ffresno\u002F",{"county":15,"tag":16,"title":17,"to":18},"Merced County","merced","Merced","\u002Fmerced\u002F",{"id":20,"title":21,"archived":22,"author":23,"body":24,"date":131,"dateModified":131,"description":132,"extension":133,"image":134,"meta":135,"navigation":136,"path":137,"rawbody":138,"section":139,"seo":140,"sitemap":141,"sourceDate":142,"stem":143,"tags":144,"__hash__":148},"news\u002Fnews\u002Fnavy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling.md","Navy study says Lemoore base AI data center would run on waterless cooling",false,"CVAI Agriculture Desk",{"type":25,"value":26,"toc":122},"minimark",[27,31,36,52,56,59,63,66,69,72,75,79,82,85,88,92,95,98,101,104,107,110,114],[28,29,21],"h1",{"id":30},"navy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling",[32,33,35],"h2",{"id":34},"key-takeaways","Key Takeaways",[37,38,39,43,46,49],"ol",{},[40,41,42],"li",{},"A 2024 Navy environmental assessment says the planned data center at Lemoore Naval Air Station would use closed-loop \"waterless\" cooling.",[40,44,45],{},"The only water the building is expected to use is for sinks and toilets serving about 20 employees.",[40,47,48],{},"The project would take 930 acres out of the base's agricultural program, saving an estimated 1,040 acre-feet of irrigation water a year.",[40,50,51],{},"Ameresco holds the 37-year lease through Oct. 31, 2053, and base spokesperson Sarah Thrasher said the data center agreement isn't finalized.",[53,54,55],"p",{},"Twenty employees. That's how many people the Navy expects to staff a 600,000-square-foot, 100-megawatt AI data center planned for Lemoore Naval Air Station, and according to the Navy's own environmental paperwork, their sinks and toilets are the only water the building should use. That's the answer to a question Kings County residents have been asking. In August, residents protested proposed \"mini\" data centers on state land in Tulare and Kings counties, mostly out of fear over how much water they'd pull from the basin.",[53,57,58],{},"SJV Water ran a story Tuesday calling the Lemoore center's water use a mystery. Later that day it posted an editor's note saying the story was in error, pointing to a 2024 assessment indicating the center will use waterless cooling and won't need extra water supplies.",[32,60,62],{"id":61},"how-the-cooling-works","How the cooling works",[53,64,65],{},"The document is the Navy's final supplemental environmental assessment, dated August 2024. It lists Jesse Martinez of Naval Facilities Engineering Systems Command Southwest in San Diego as the point of contact.",[53,67,68],{},"Chillers outside dump the heat. Inside, air handlers move that heat through coils and a closed fluid loop. The main loop is \"free cooling\" on heat transfer fluid, with a backup mechanical loop running on refrigerant. Wastewater would go to a septic system.",[53,70,71],{},"Except for drinking water for the staff, the lessee would meet all of the project's water needs from offsite sources, the assessment says, and the base wouldn't supply water for construction. It finds no groundwater use from building or running the data center or the energy systems around it.",[53,73,74],{},"Those energy systems are big. The plan allows up to 425 megawatts of solar, battery storage, an EV station with up to 20 fast chargers and up to 185 megawatts of backup generation. Grading would take about 128 acre-feet of water for dust. Panel washing needs about 21.25 acre-feet of deionized water a year, trucked in by the lessee from an offsite source.",[32,76,78],{"id":77},"the-ground-it-comes-out-of","The ground it comes out of",[53,80,81],{},"All of it sits on a 930-acre parcel in the southeast part of the base. Ameresco got the lease in January 2024 when it bought Bright Canyon Energy, which had held the ground since 2019 without building anything. The Navy, Ameresco and CyrusOne announced the data center in September 2025.",[53,83,84],{},"The Navy counts the parcel in the base's ag program, which Westlands Water District supplies with Central Valley Project water. That supply swings. In a full allocation year, each irrigable acre gets 2.6 acre-feet. Allocations since 2003 have run from zero in 2014, 2015, 2021 and 2022 to 100% in 2006 and 2017, averaging 43%. At that average, the assessment figures pulling 930 acres saves 1,040 acre-feet a year.",[53,86,87],{},"This water year's allocation opened at 15% and climbed to 31%, SJV Water reported.",[32,89,91],{"id":90},"what-isnt-settled","What isn't settled",[53,93,94],{},"Sarah Thrasher, the base spokesperson, wrote in an email that the base's water use and rights aren't public and that the data center agreement isn't finalized.",[53,96,97],{},"Westlands spokesperson Matt Mahon sent questions back to the Navy.",[53,99,100],{},"\"Any other questions about the base or the data center water use will need to be directed to the Navy,\" Mahon wrote in an email.",[53,102,103],{},"On paper, Westlands has rights to make 5,000 acre-feet a year available to the base, and it delivered 1,366 acre-feet there from March through August, according to the district's Sept. 15 board packet.",[53,105,106],{},"Ameresco has said the first portion should come online in 2027. The lease language lets the Navy approve leaving the parcel vacant when the lease runs out if it no longer has a Westlands allocation, and the assessment says it might not go back to farming.",[108,109],"hr",{},[32,111,113],{"id":112},"source","Source",[53,115,116],{},[117,118,119],"a",{"href":119,"rel":120},"https:\u002F\u002Fsjvwater.org\u002Fwater-use-for-proposed-ai-data-center-on-lemoore-naval-air-station-a-mystery\u002F",[121],"nofollow",{"title":123,"searchDepth":124,"depth":124,"links":125},"",2,[126,127,128,129,130],{"id":34,"depth":124,"text":35},{"id":61,"depth":124,"text":62},{"id":77,"depth":124,"text":78},{"id":90,"depth":124,"text":91},{"id":112,"depth":124,"text":113},"2026-11-19T12:09:54Z","A 2024 Navy environmental assessment says the 100-megawatt center would cool with closed-loop chillers, truck in outside water and pull 930 acres out of the base's ag program.","md","construction-site-crane-farmland-aerial-8f5234",{},true,"\u002Fnews\u002Fnavy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling","---\nauthor: CVAI Agriculture Desk\ndate: '2026-11-19T12:09:54Z'\ndateModified: '2026-11-19T12:09:54Z'\ndescription: A 2024 Navy environmental assessment says the 100-megawatt center would\n  cool with closed-loop chillers, truck in outside water and pull 930 acres out of\n  the base's ag program.\nimage: construction-site-crane-farmland-aerial-8f5234\nsection: agriculture\nsourceDate: '2026-11-17'\ntags:\n- central valley\n- water\n- data centers\ntitle: Navy study says Lemoore base AI data center would run on waterless cooling\n---\n\n# Navy study says Lemoore base AI data center would run on waterless cooling\n\n## Key Takeaways\n\n1. A 2024 Navy environmental assessment says the planned data center at Lemoore Naval Air Station would use closed-loop \"waterless\" cooling.\n2. The only water the building is expected to use is for sinks and toilets serving about 20 employees.\n3. The project would take 930 acres out of the base's agricultural program, saving an estimated 1,040 acre-feet of irrigation water a year.\n4. Ameresco holds the 37-year lease through Oct. 31, 2053, and base spokesperson Sarah Thrasher said the data center agreement isn't finalized.\n\nTwenty employees. That's how many people the Navy expects to staff a 600,000-square-foot, 100-megawatt AI data center planned for Lemoore Naval Air Station, and according to the Navy's own environmental paperwork, their sinks and toilets are the only water the building should use. That's the answer to a question Kings County residents have been asking. In August, residents protested proposed \"mini\" data centers on state land in Tulare and Kings counties, mostly out of fear over how much water they'd pull from the basin.\n\nSJV Water ran a story Tuesday calling the Lemoore center's water use a mystery. Later that day it posted an editor's note saying the story was in error, pointing to a 2024 assessment indicating the center will use waterless cooling and won't need extra water supplies.\n\n## How the cooling works\n\nThe document is the Navy's final supplemental environmental assessment, dated August 2024. It lists Jesse Martinez of Naval Facilities Engineering Systems Command Southwest in San Diego as the point of contact.\n\nChillers outside dump the heat. Inside, air handlers move that heat through coils and a closed fluid loop. The main loop is \"free cooling\" on heat transfer fluid, with a backup mechanical loop running on refrigerant. Wastewater would go to a septic system.\n\nExcept for drinking water for the staff, the lessee would meet all of the project's water needs from offsite sources, the assessment says, and the base wouldn't supply water for construction. It finds no groundwater use from building or running the data center or the energy systems around it.\n\nThose energy systems are big. The plan allows up to 425 megawatts of solar, battery storage, an EV station with up to 20 fast chargers and up to 185 megawatts of backup generation. Grading would take about 128 acre-feet of water for dust. Panel washing needs about 21.25 acre-feet of deionized water a year, trucked in by the lessee from an offsite source.\n\n## The ground it comes out of\n\nAll of it sits on a 930-acre parcel in the southeast part of the base. Ameresco got the lease in January 2024 when it bought Bright Canyon Energy, which had held the ground since 2019 without building anything. The Navy, Ameresco and CyrusOne announced the data center in September 2025.\n\nThe Navy counts the parcel in the base's ag program, which Westlands Water District supplies with Central Valley Project water. That supply swings. In a full allocation year, each irrigable acre gets 2.6 acre-feet. Allocations since 2003 have run from zero in 2014, 2015, 2021 and 2022 to 100% in 2006 and 2017, averaging 43%. At that average, the assessment figures pulling 930 acres saves 1,040 acre-feet a year.\n\nThis water year's allocation opened at 15% and climbed to 31%, SJV Water reported.\n\n## What isn't settled\n\nSarah Thrasher, the base spokesperson, wrote in an email that the base's water use and rights aren't public and that the data center agreement isn't finalized.\n\nWestlands spokesperson Matt Mahon sent questions back to the Navy.\n\n\"Any other questions about the base or the data center water use will need to be directed to the Navy,\" Mahon wrote in an email.\n\nOn paper, Westlands has rights to make 5,000 acre-feet a year available to the base, and it delivered 1,366 acre-feet there from March through August, according to the district's Sept. 15 board packet.\n\nAmeresco has said the first portion should come online in 2027. The lease language lets the Navy approve leaving the parcel vacant when the lease runs out if it no longer has a Westlands allocation, and the assessment says it might not go back to farming.\n\n---\n\n## Source\n\nhttps:\u002F\u002Fsjvwater.org\u002Fwater-use-for-proposed-ai-data-center-on-lemoore-naval-air-station-a-mystery\u002F\n","agriculture",{"title":21,"description":132},{"loc":137},"2026-11-17","news\u002Fnavy-study-says-lemoore-base-ai-data-center-would-run-on-waterless-cooling",[145,146,147],"central valley","water","data centers","ztxwOqcnkXRBz_kMI62czh_iLPqgIM8Re4zdLyAPYiw",{"id":150,"title":151,"body":152,"description":156,"extension":133,"intro":157,"meta":158,"navigation":136,"order":159,"path":160,"seo":161,"stem":162,"__hash__":163},"sections\u002Fsections\u002Fagriculture.md","Agriculture & Water",{"type":25,"value":153,"toc":154},[],{"title":123,"searchDepth":124,"depth":124,"links":155},[],"AI on Central Valley farms and in the fights over the water they depend on.","Growers, researchers and water districts using AI in orchards and fields, and the water questions every new project raises in the Valley.",{},3,"\u002Fsections\u002Fagriculture",{"title":151,"description":156},"sections\u002Fagriculture","0TESsPZleodMkCVDiLFJLpxNNrYmvG7IGHrFlsr37BI",{"id":165,"aiLook":22,"alt":166,"description":167,"extension":168,"focus":169,"height":172,"meta":173,"people":174,"quality":175,"sections":176,"setting":179,"settingNote":180,"sha256":181,"source":182,"stem":188,"subjects":189,"tagger":198,"text":174,"width":200,"__hash__":201},"images\u002Fimages\u002Fconstruction-site-crane-farmland-aerial-8f5234.yml","Overhead view of a construction site with a yellow tower crane, concrete foundation and gravel piles beside a plowed field","Top-down drone view of a building site carved out of open farmland: a poured concrete foundation in an excavated pit, a yellow tower crane, a partly built multi-story structure with materials on its roof, dirt and gravel piles, and a row of parked vehicles. A bare field and a rural road border the site.","yml",{"x":170,"y":171},0.6,0.55,3750,{},"none","good",[177,178],"business","energy","valley","Flat bare farm field and dirt site show nothing that rules out the Valley edge, though the green verge and trees are slightly temperate.","8f5234304f289e4a67f3afda4987077288d75a107fecac15d1e8a308540cfc70",{"file":183,"provider":184,"search":185,"title":186,"downloaded":187,"imported":187},"construction-site-aerial-view-with-crane-and-truck-2026-09-21-14-07-45-utc.jpg","envato-elements","industrial land development site","Construction site aerial view with crane and truck","2026-11-06","images\u002Fconstruction-site-crane-farmland-aerial-8f5234",[190,191,192,193,194,195,196,197],"construction site","tower crane","concrete foundation","excavation","gravel pile","farmland","parked vehicles","building under construction",{"date":187,"model":199},"claude-opus-5-5",5000,"DjPOoboO1b9K4Dpjx3YWte4WGmC7emcSckxD0xM8fkc",{"city":203,"section":204},null,[205,216,227,238],{"date":206,"description":207,"path":208,"section":139,"tags":209,"title":210,"photo":211},"2026-09-29T00:33:12Z","A Fresno Bee fact check shows both District 1 supervisor candidates rejecting AI data centers over water concerns. Here’s what that means for growers and towns on the westside.","\u002Fnews\u002Ffresno-d1-supervisor-runoff-karbassi-pacheco-say-no-to-ai-data-centers-over-water",[146,11,139],"Fresno D1 supervisor runoff: Karbassi, Pacheco say no to AI data centers over water",{"alt":212,"focus":213,"id":215},"Bright white data center room with caged rows of server cabinets, raised floor tiles and overhead cable trays",{"x":170,"y":214},0.45,"data-center-caged-server-racks-aaaae1",{"date":217,"description":218,"path":219,"section":139,"tags":220,"title":221,"photo":222},"2026-08-30T12:16:36Z","At a Thursday webinar, panelists urged Central Valley boards and residents to require clear water-use details, cooling plans, and no NDAs from AI data center developers.","\u002Fnews\u002Fexperts-tell-valley-growers-demand-water-numbers-from-ai-data-centers",[139,146,145],"Experts tell Valley growers: demand water numbers from AI data centers",{"alt":223,"focus":224,"id":226},"Row of white cylindrical cooling tower fans on boxy units with dark louvered sides atop a concrete roof under blue sky",{"x":225,"y":171},0.62,"rooftop-cooling-towers-blue-sky-43e6ff",{"date":228,"description":229,"path":230,"section":139,"tags":231,"title":233,"photo":234},"2026-06-25T12:52:56Z","Organizers say the new center will give Valley growers, startups, and students access to advanced computing and AI tools. The public launch is set for July 9 at the Fresno State Library.","\u002Fnews\u002Ffresno-state-to-host-july-9-launch-for-central-valley-supercomputing-center",[11,139,232],"education","Fresno State to host July 9 launch for Central Valley Supercomputing Center",{"alt":235,"focus":236,"id":237},"Brightly lit server room with white and black equipment cabinets on a white tiled raised floor under fluorescent lights",{"x":171,"y":171},"server-room-white-cabinets-raised-floor-f2a573",{"date":239,"description":240,"path":241,"section":139,"tags":242,"title":244,"photo":245},"2026-05-17T12:26:39Z","Bring Back the Kern is using an AI image contest to spotlight the mostly dry Kern River through Bakersfield and to build public support for restoring flows through the city.","\u002Fnews\u002Fgroup-looks-to-ai-for-water-in-the-kern-river",[146,243,6],"technology","Group looks to AI for water in the Kern River",{"alt":246,"focus":247,"id":249,"generated":136},"Shallow muddy trickle winding down a sandy riverbed between dry golden grass and green shrubs, low houses and hills behind",{"x":248,"y":171},0.5,"shallow-sandy-riverbed-dry-grass-860d10",1795090500348]